Engineering & Construction Division

Water Standard Plans 2025

Preface

These standard plans incorporate current Water regulations and City water system operation, maintenance, and asset management considerations. 

The plan numbering structure of this document follows the same basic structure as the APWA Standard 

Plans, however, there are some differences.  Following is an explanation of the structure of this document:

1. Part 5 – Water Systems.  Standard Plan divisions for Water system related details are:

0 found in 0 section(s)
  • Corrosion Protection Systems
  • Fire Hydrants
  • General
  • Piping
  • Preface, Updates, and Table of Contents
  • Thrust Blocks
  • Trenching
  • Valves
  • Water Meters
  • Water Notes

2. Numbering – A plan number having a suffix of “S” identifies that the plan contains index, legend, detail specific notes, and acceptable manufacturer and parts numbers related to the standard plan. 

This document is intended to be altered periodically to ensure that the most current Park City Standards are available for public use.  This document will be revised and published on the City’s website as updates are approved and adopted. 

The Complete Water Standard Plans is provided below in an electronic format file.

0 found in 0 section(s)
eNotification Signup | Change eNotification Preferences