The Engineering Department coordinates, reviews, and approves all private-funded public improvements initiated by the development community, from design through construction to completion. The Engineering Team works closely with the Planning and Building Teams to accomplish this task.

In addition, the Engineering Team reviews and manages many of the City's capital improvement projects. The Department's Public Improvements Inspector inspects all water line installation and work that occurs within the public right-of-way.

 

Park City Supplemental Standards and Specifications

The City has adopted the American Public Works Association (APWA) Standard Specifications and Plans as the standards for all construction and improvements in the public right-of-way. The Engineering Team additionally maintains and updat the City Supplemental Standards and Specifications to be used in conjunction with the APWA standards.

Park City 2025 Supplemental Standards and Specifications

Traffic Impact Study Guidelines

The Traffic Impact Study Guidelines provide a framework for when a transportation impact study may be required for new land use developments or redevelopments in Park City. The required contents of the transportation impact study are also provided in these guidelines. 

Traffic Impact Study Guidelines

TO REPORT SIDEWALK, CURB & GUTTER, DRAINAGE AND/OR CONSTRUCTION ISSUES PLEASE CONTACT THE PUBLIC IMPROVEMENTS INSPECTOR, 435-615-5071. IF AFTER HOURS OR AN EMERGENCY PLEASE CONTACT POLICE DISPATCH AT 435-615-5500.

THANK YOU FOR YOUR TIME AND EFFORT IN KEEPING PARK CITY BEAUTIFUL AND SAFE.

List of Private and Public Roads

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Acrobat Reader Download Acrobat Reader Windows Media Player Download Windows Media Player Word Viewer Download Word Viewer Excel Viewer Download Excel Viewer PowerPoint Viewer Download PowerPoint Viewer

Current Engineering RFP's

Public Notice of Proposed Waiver: Construction of Sidewalk Improvements, SR-224

  • Department:Engineering, BPE - Building / Planning / Engineering
  • Start Date:04/09/2026
  • Close Date:04/17/2026

PUBLIC NOTICE OF PROPOSED WAIVER

  • Date Issued: April 9, 2026
  • Proposed Service: Construction of Sidewalk Improvements – SR-224 (US Bank to City Park)
  • Proposed Provider: STACY AND WITBECK, INC.
  • Requesting Department: Engineering & Transportation Planning

Please take notice of Park City Municipal Corporation’s (PCMC’s) intent to waive a competitive procurement process. PCMC Procurement Rule 5-3 provides that the competitive procurement requirements may be waived under circumstances where there is a reasonable justification and the waiver is in the best interests of PCMC.  

The Procurement Official has determined that a waiver is appropriate for a contract for construction services associated with the SR-224 Sidewalk Improvement Project in the amount of $371,308.00 with contractor STACY AND WITBECK, INC., based on the information below:

Waiver Justification:

Per Procurement Policy Section 5-3 (Waiver of Standard Procurement Process), awarding a contract without engaging in a Standard Procurement Process is appropriate where doing so is impractical and not in the best interest of PCMC. This project is directly adjacent to and functionally tied to the ongoing SR-224 Bus Rapid Transit (BRT) improvements currently under construction by STACY AND WITBECK. Coordinating this sidewalk gap closure work with the existing contractor provides substantial cost savings, reduces public impacts, and ensures consistency in design and construction.

Key considerations include:

  • Permitting Efficiency (UDOT Coordination): STACY AND WITBECK currently holds active UDOT permits for work within this corridor. Completing this work under amended existing permits avoids a separate, time-intensive permitting process that could take several months and may not be feasible within the current or next construction season. This approach is estimated to save approximately $10,000 in permitting and associated soft costs.
  • Mobilization and Traffic Control Savings: Mobilization, staging, and traffic control are already in place for the BRT project. Procuring this work separately would require duplicative mobilization and traffic control, resulting in an estimated additional cost of approximately $20,000.
  • Impracticality of Competitive Procurement: Due to the active construction environment, traffic control constraints, and UDOT permit limitations, it is unlikely that a separate procurement would result in meaningful competition. A new contractor would face significant barriers to entry, including restricted access, schedule constraints, and inability to leverage existing permits and traffic control setups.
  • Matching Existing Improvements / Avoiding Throwaway Work: Constructing this segment concurrently ensures the sidewalk is built to current City standards (6-foot width) continuously through the corridor. Delaying the work would require temporary transitions to existing substandard sidewalk widths (~4 feet), resulting in inefficient “throwaway” work and future rework costs.
  • Public Convenience and Impact Reduction: Completing the work concurrently minimizes disruptions to residents, businesses, and roadway users. If completed separately, the public would experience multiple construction impacts over multiple years rather than a single, coordinated effort. This is particularly important for adjacent properties, including an HOA with multiple driveway access points already impacted by the BRT project.
  • Consistency in Public Right-of-Way Improvements: Coordinated construction ensures a consistent, ADA-compliant pedestrian facility along the corridor without interim gaps in standard.      

*To submit comments regarding this Notice of Proposed Waiver, please email Stormie Dawn at stormie.dawn@parkcity.gov within seven days of the date of posting.